Ombineo power plants
Client
CS Ombrineo
ROLE
GenSun ʺturnkeyʺ EPC
LOCATION
France
DATE
2016
CLIENT SPECIFICS
Roof-top power station at Ombrières
PONTICELLI’S CHALLENGES
Partially polluted site (hydrocarbons, asbestos etc…). Monitored active/reactive power management system according to Enedis instructions. In-situ tests of modules in a mobile laboratory.
GenSun + Thermo drone
SCOPE
Engineering, civil engineering, structures, electrification
- Project cost: € 2,219,300 net
- 4,452 C-SI ‘Back Contact’ 327 Wc AUO modules
- Galvanized steel structure with single column – foundation columns 4-6 m, S4 concrete (harsh environment
- 42 ABB TRIO 27.6-TL string inverters, Gay Electricité transformer substations and energy distribution: 1,250 kVA
KEY FIGURES
1,455,800 Wc
power installed
7,000m²
about of covered surface
Projects
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Your Ponticelli contact
Vincent Ladougne
1 rue Lilienthal - Emerainville - BP 79
77312 Marne-la-Vallée Cedex 2
France
+33 (0)1 64 11 11 64
Contact-us