Replacement of EVC on the Beaumont Monteux dam
Client
EDF
ROLE
Co-contractor with the company ATB for the replacement of 6 spillway valves
LOCATION
Beaumont Monteux EDF dam – France (Dpt 26)
DATE
Works in progress
CLIENT SPECIFICS
The dam at Beaumont Monteux is composed of 6 valves (18 m wide, 12 m high, 130 tons) that were put into service in 1921. To meet current safety requirements EDF must replace these 6 valves and their manoeuvring components.
PONTICELLI’S CHALLENGES
The works included a large range of activities in which Ponticelli is specialised (smelting, topography, heavy handling by cranes, winching and displacing with a Tirfor
SCOPE
- Dismantling of old valves: 35 components from 3 to 5 tons
- Installation precision of fixed elements: 2mm planarity with an 18 m reach.
- Installation of new valves in 5 elements from 25 to 30 tons.
- 70 m of welding flash, 14 to 50 mm thickness.
KEY FIGURES
70m
of welding flash
2mm
planarity with an 18 m reach
Projects
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Your Ponticelli contact
Vincent Ladougne
1 rue Lilienthal - Emerainville - BP 79
77312 Marne-la-Vallée Cedex 2
France
+33 (0)1 64 11 11 64
Contact-us